Production
Our Vietnam factory is capable of making high quality garments. Our goal is to satisfy the customer and build a long term business relationship.
Product Capacity
Item
–
Blouse/Shirt
Pants/ Bottom
Jacket
Skirt/Dress
Total:
Total Lines:
All Factories (Pcs)
–
80,000
110,000
60,000
120,000
370,000
10 - 15 lines
Quality Control
All garments and materials that move through our factories undergo a thorough quality check to make sure the highest standards are kept.
Inline Inspection → End Line Inspection → Measurement Checking → Drawing Pattern On Ironing Table → Visual Inspection (After Ironing) → Measurement Checking → Pre Final Inspection → Final Inspection
Services provided during production:
Weight test
Washing test
Shade band test
Shrinkage test
Cutting panel inspection for sizing consistency
Numbering system or color and shade control
Get your product where it needs to go
Sailing Time
Finished Goods
Korea fabric and trims to HCM:
7 days sailing and 2 days customs clearance
From Ho Chi Minh City:
To New York: 27 - 30 days
To Le Havre (France): 30 Days
To Los Angeles: 18 days
To Hamburg (Germany): 23 days
To South Hampton (UK): 26 days
China fabric and trims to HCM:
3 days from Guangzhou, 6 days from Shanghai and 2 days customs clearanc